Samples / GLPI-103 / regulatory/m3-quality/M3-PV_process_validation.md

Process Development & Validation Summary — GLPI-103

Field Value
Document ID M3-PV
Version 2.0 (expanded)
Standard ICH Q8(R2)/Q11/Q12; FDA & EMA process-validation lifecycle (Q10)
Confidentiality Confidential

[MOCK — deep-knowledge assumption] Process development and validation for the drug substance and both drug products, including a worked PPQ deviation and the scale-up comparability assessment.

Change History

Version Date Author Summary
1.0 2026-06-29 CMC / Manufacturing Initial
2.0 2026-06-30 CMC / Manufacturing Expanded — PPQ results, deviation (ISS-010), comparability, CPV

1. Lifecycle Approach (3 stages)

2. Drug Substance (SPPS) — PPQ

Three consecutive 2 kg PPQ batches met all CQAs (assay 99.1–99.5%, total related substances ≤1.2%, aggregates ≤0.5%, potency in range), with CPPs within their proven acceptable ranges and consistent impurity profiles. Worked deviation (QA-003 ISS-010): PPQ batch 2 raised a transient lyophiliser shelf-loading inhomogeneity flag. Investigation concluded the batch met all CQAs (deviation not product-impacting); CAPA: a revised, qualified loading pattern and an added in-process check were implemented and folded into CPV — a worked example of a managed PPQ deviation.

3. Drug Product — PPQ

4. Scale-Up & Comparability (Q5E/Q12)

Comparability between the development and registration scales/sites was demonstrated by side-by-side analytical characterisation (RP-HPLC/SE-HPLC/peptide map/potency) and a stability bridge; no impact on the impurity/aggregate profile or potency was observed. Post-approval changes are governed by the defined Established Conditions (ICH Q12) with appropriate reporting categories.

5. Conclusion

The drug-substance and drug-product processes are robust, reproducible, and validated to consistently produce material meeting CQAs and specifications (M3-S/M3-P); deviations encountered during qualification were investigated and resolved with verified CAPAs (QA-003), and the validated state is maintained by CPV.